Federal opportunity · Award Notice
AwardedUSS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
N5523626R0009 · Dept of Defense · SAM.gov
Awarded to FAIRBANKS MORSE, LLC 701 WHITE AVE Beloit WI 53511 USA · $3,404,927 · Nov 3, 2026
Who won it
- Awardee
- FAIRBANKS MORSE, LLC 701 WHITE AVE Beloit WI 53511 USA
- Amount
- $3,404,927
- Award date
- Nov 3, 2026
- Contract number
- N5523627C0001
- Posted
- Nov 4, 2026
- NAICS code
- 333618 · Other Engine Equipment Manufacturing
- Set-aside
- None
- Place of performance
- Not listed
- Notice type
- Award Notice
- Solicitation number
- N5523626R0009
- Official notice
- View on SAM.gov →
Open opportunities in Other Engine Equipment Manufacturing
- 29--Starter,engine,gas TurDept of Defense · Due Nov 8, 2026 · 2 days left
- 28--Engine Block Assembly,Dept of Defense · Due Nov 8, 2026 · 2 days left
- 29--Nozzle,fuel InjectionDept of Defense · Due Nov 8, 2026 · 2 days left
- 29--Cylinder,engine StartiDept of Defense · Due Nov 8, 2026 · 2 days left
- 28--Piston,internal CombusDept of Defense · Due Nov 8, 2026 · 2 days left
- 28--Power Unit,dieselDept of Defense · Due Nov 8, 2026 · 2 days left
What the agency bought
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source.
Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals.
Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference.
The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
From the official notice on SAM.gov.