Federal opportunity · Presolicitation
ClosedUpper Wicomico River Dredging Project, Wicomico County, MD
W912DR27BA002 · Dept of Defense · SAM.gov
Closed. Responses were due Oct 21, 2026, 11:00 AM ET.
- Responses due
- Oct 21, 2026, 11:00 AM ET
- Posted
- Oct 6, 2026
- NAICS code
- 237990 · Other Heavy and Civil Engineering Construction
- Set-aside
- Small Business Set Aside - Total
- Place of performance
- Not listed
- Notice type
- Presolicitation
- Solicitation number
- W912DR27BA002
- Official notice
- View on SAM.gov →
Similar open opportunities
- Tybee Island Shoreline Protection ProjectDept of Defense · Due Nov 6, 2026 · Under a day left
- P-1417: Containerized Long Weapons Storage Magazine, Naval Weapons Station Yorktown, Yorktown, Virginia & P-1418: Conventional Prompt Strike (CPS) Weapons Maintenance and Storage Facility, Naval Weapons Station Yorktown, Yorktown, VirginiaDept of Defense · Due Nov 6, 2026 · Under a day left
- Tenkiller Hydropower Excitation System ReplacementDept of Defense · Due Nov 6, 2026 · Under a day left
- FY27 Texas City Ship Channel Main Channel and Turning BasinDept of Defense · Due Nov 7, 2026 · Under a day left
- Kissimmee River Restoration (KRR) Project, S-69 Weir RepairDept of Defense · Due Nov 9, 2026 · 2 days left
- Arcadia Wet Well RehabilitationDept of Defense · Due Nov 9, 2026 · 3 days left
What the agency was buying
The U.S. Army Corps of Engineers (USACE), Baltimore District will be completing maintenance dredging in the upper half of the Wicomico River, Wicomico County, MD. Material will be placed at an existing upland placement site near the river named Sharps Point located in Salisbury, MD. The Magnitude of Construction is $4,000,000.00 to $8,000,000.00. The construction duration will be approximately 120 calendar days from Notice to Proceed.The scope includes using a hydraulic dredge and pipeline in the upper portion of the Wicomico River to remove material to its authorized depth of 14 feet. Approximately 250,000 cubic yards of material consisting of silts, sand, clays, mixed shell, gravel and other materials will be dredged and placed at the Sharps Point site. Minor construction of two weir boxes will also occur at the placement site prior to dredging operations.
From the official notice on SAM.gov.