Federal opportunity · Solicitation
ClosedTwo Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
W912DS26RA032 · Dept of Defense · SAM.gov
Closed. Responses were due Oct 19, 2026, 2:00 PM ET.
- Responses due
- Oct 19, 2026, 2:00 PM ET
- Posted
- Oct 2, 2026
- NAICS code
- 237990 · Other Heavy and Civil Engineering Construction
- Set-aside
- None
- Place of performance
- Port Monmouth, NJ
- Notice type
- Solicitation
- Solicitation number
- W912DS26RA032
- Official notice
- View on SAM.gov →
Similar open opportunities
- Tybee Island Shoreline Protection ProjectDept of Defense · Due Nov 6, 2026 · Under a day left
- P-1417: Containerized Long Weapons Storage Magazine, Naval Weapons Station Yorktown, Yorktown, Virginia & P-1418: Conventional Prompt Strike (CPS) Weapons Maintenance and Storage Facility, Naval Weapons Station Yorktown, Yorktown, VirginiaDept of Defense · Due Nov 6, 2026 · Under a day left
- Tenkiller Hydropower Excitation System ReplacementDept of Defense · Due Nov 6, 2026 · Under a day left
- FY27 Texas City Ship Channel Main Channel and Turning BasinDept of Defense · Due Nov 7, 2026 · Under a day left
- Kissimmee River Restoration (KRR) Project, S-69 Weir RepairDept of Defense · Due Nov 9, 2026 · 2 days left
- Arcadia Wet Well RehabilitationDept of Defense · Due Nov 9, 2026 · 3 days left
What the agency was buying
As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted.
The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
From the official notice on SAM.gov.