Federal opportunity · Presolicitation
MSD Infrastructure Repairs Phase 2
W912P926BA008 · Dept of Defense · SAM.gov
- Responses due
- Not listed
- Posted
- Jun 23, 2026
- NAICS code
- 237110 · Water and Sewer Line and Related Structures Construction
- Set-aside
- None
- Place of performance
- Not listed
- Notice type
- Presolicitation
- Solicitation number
- W912P926BA008
- Official notice
- View on SAM.gov →
What the agency is buying
The U. S. Army Corps of Engineers, St. Louis District proposes to provide Federal construction assistance to Metropolitan St. Louis Sewer District for the rehabilitation of combined sewers. The subject project consists of sewer rehabilitation utilizing Cured-In-Place Pipe (CIPP) methods. The rehabilitation work is generally described within of the Metropolitan St. Louis Sewer District specifications as follows: The work will consist of furnishing all labor, equipment, operators, supervision, supplies and materials, and incidentals necessary to perform sewer rehabilitation of approximately 2,675 lineal feet of sewers, sized at 21 inches in diameter to 24 inches in diameter utilizing CIPP methods.
The project is within the MSD Boundaries, which includes the City of St. Louis and St. Louis County, Missouri. The work will be performed in various quantities at various sites. The initial work identified is in MSDs Service Area 1.
From the official notice on SAM.gov.
See if this one is a Go for your company. Get your score →
Similar open opportunities
- PLA RFI for Repair of Waterfront Utility Services Transmitted via a Utilidor Tunnel at NSB Kings Bay, GADept of Defense · Due Nov 9, 2026 · 2 days left
- Fort Mifflin Sewage Lift Station - Certified Bid AbstractDept of Defense · Due Nov 10, 2026 · 3 days left
- Request for Information – Four FY24 Design-Build to Budget Projects; Fort Shafter, HMR, Schofield Barracks and Schofield Barracks East Range.Dept of Defense · Due Nov 10, 2026 · 4 days left
- Atchison Storm Sewer Separation Improvements, Atchison, KansasDept of Defense · Due Nov 13, 2026 · 6 days left
- Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)Dept of Defense · Due Dec 3, 2026 · 26 days left
- USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CADept of Defense · Due Dec 7, 2026 · 30 days left