Federal opportunity · Special Notice
ClosedMarket Intelligence: JDWC Progressive Design-Build OTA
W912HN27SA001 · Dept of Defense · SAM.gov
Closed. Responses were due Oct 29, 2026, 5:00 PM ET.
- Responses due
- Oct 29, 2026, 5:00 PM ET
- Posted
- Oct 26, 2026
- NAICS code
- 236220 · Commercial and Institutional Building Construction
- Set-aside
- None
- Place of performance
- Not listed
- Notice type
- Special Notice
- Solicitation number
- W912HN27SA001
- Official notice
- View on SAM.gov →
Similar open opportunities
- Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CTDept of Defense · Due Nov 6, 2026 · Under a day left
- Saber FY 27-32Dept of Defense · Due Nov 6, 2026 · Under a day left
- Navy Child Development Centers (CDC) Industrialized Construction (IC) Projects via Other Transaction Authority (10 U.S.C. § 2808a)Dept of Defense · Due Nov 6, 2026 · Under a day left
- 163rd CE Flooring & Painting 2272Dept of Defense · Due Nov 6, 2026 · Under a day left
- Building 143 Concrete Scale Pad Expansion and Dock Leveler ReplacementDept of Defense · Due Nov 9, 2026 · 2 days left
- Renovate Building 286 & Building 497, Demolish Building 298Dept of Defense · Due Nov 9, 2026 · 2 days left
What the agency was buying
(Please see attached Special Notice document W912HN27SA001 for full details and submission instructions).The U.S. Army Corps of Engineers (USACE), Savannah District, is issuing this Special Notice to conduct Market Intelligence for the Joint Deployment Warfighting Complex (JDWC) at Fort Bragg, North Carolina. This project will be procured utilizing a Progressive Design-Build (PDB) delivery method under the 10 U.S.C. 2808a Other Transaction (OT) authority for Construction. Project Snapshot: Scope: Design and construction of a high-security facility accommodating 750 personnel.
Features include Secure Administrative Areas, Operations Centers, and SCIF spaces with stringent security requirements, along with fully redundant electrical/mechanical systems and major civil site modifications. Estimated Construction Budget: $350.0 Million. Acquisition Strategy: A streamlined, two-step Qualifications-Based Selection (QBS) process (Step 1: White Papers / Step 2: Pitch Meetings).Action Required: This is an Advance Notice for informational, planning, and market intelligence purposes only; it is not a formal Request for Proposal (RFP).Interested parties are requested to submit a capability statement (maximum of 5 pages) outlining their interest, bonding capacity, and relevant PDB and secure facility experience.
Responses are due no later than October 29, 2026, at 4:00 PM Eastern Standard Time. All submissions must be electronic and emailed directly to the Points of Contact listed in the attached document. No hardcopy responses will be accepted.
From the official notice on SAM.gov.