AwardedKansas City Levees UPRR Closure Structure
W912DQ26RA035 · Dept of Defense · SAM.gov
Awarded to MOBLEY CONTRACTORS, INC 952 HIGHWAY 287 MORRILTON 72110 USA · $18,803,862 · Aug 21, 2026
Who won it
- Awardee
- MOBLEY CONTRACTORS, INC 952 HIGHWAY 287 MORRILTON 72110 USA
- Amount
- $18,803,862
- Award date
- Aug 21, 2026
- Contract number
- W912DQ26CA044
- Posted
- Aug 24, 2026
- NAICS code
- 237990 · Other Heavy and Civil Engineering Construction
- Set-aside
- None
- Place of performance
- Not listed
- Notice type
- Award Notice
- Solicitation number
- W912DQ26RA035
- Official notice
- View on SAM.gov →
Similar open opportunities
- Tybee Island Shoreline Protection ProjectDept of Defense · Due Nov 6, 2026 · Under a day left
- P-1417: Containerized Long Weapons Storage Magazine, Naval Weapons Station Yorktown, Yorktown, Virginia & P-1418: Conventional Prompt Strike (CPS) Weapons Maintenance and Storage Facility, Naval Weapons Station Yorktown, Yorktown, VirginiaDept of Defense · Due Nov 6, 2026 · Under a day left
- Tenkiller Hydropower Excitation System ReplacementDept of Defense · Due Nov 6, 2026 · Under a day left
- FY27 Texas City Ship Channel Main Channel and Turning BasinDept of Defense · Due Nov 7, 2026 · Under a day left
- Kissimmee River Restoration (KRR) Project, S-69 Weir RepairDept of Defense · Due Nov 9, 2026 · 2 days left
- Arcadia Wet Well RehabilitationDept of Defense · Due Nov 9, 2026 · 3 days left
What the agency bought
The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)- owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units. The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202. Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees.
Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages. Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track.
Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.
From the official notice on SAM.gov.