Federal opportunity · Award Notice
AwardedKahauiki Stream Maintenance Dredging, Phase 2, Fort Shafter Flats, Oahu, Hawaii
W9128A25RA005 · Dept of Defense · SAM.gov
Awarded to ELITE PACIFIC CONSTRUCTION INC. 46-174 KAHUHIPA ST RM B2 KANEOHE HI 96744 USA · $7,870,000 · Sep 29, 2026
Who won it
- Awardee
- ELITE PACIFIC CONSTRUCTION INC. 46-174 KAHUHIPA ST RM B2 KANEOHE HI 96744 USA
- Amount
- $7,870,000
- Award date
- Sep 29, 2026
- Contract number
- W9128A26CA017
- Posted
- Oct 5, 2026
- NAICS code
- 237990 · Other Heavy and Civil Engineering Construction
- Set-aside
- Small Business Set Aside - Total
- Place of performance
- Not listed
- Notice type
- Award Notice
- Solicitation number
- W9128A25RA005
- Official notice
- View on SAM.gov →
Similar open opportunities
- Tybee Island Shoreline Protection ProjectDept of Defense · Due Nov 6, 2026 · Under a day left
- P-1417: Containerized Long Weapons Storage Magazine, Naval Weapons Station Yorktown, Yorktown, Virginia & P-1418: Conventional Prompt Strike (CPS) Weapons Maintenance and Storage Facility, Naval Weapons Station Yorktown, Yorktown, VirginiaDept of Defense · Due Nov 6, 2026 · Under a day left
- Tenkiller Hydropower Excitation System ReplacementDept of Defense · Due Nov 6, 2026 · Under a day left
- FY27 Texas City Ship Channel Main Channel and Turning BasinDept of Defense · Due Nov 7, 2026 · Under a day left
- Kissimmee River Restoration (KRR) Project, S-69 Weir RepairDept of Defense · Due Nov 9, 2026 · 2 days left
- Arcadia Wet Well RehabilitationDept of Defense · Due Nov 9, 2026 · 3 days left
What the agency bought
Project Location: Fort Shafter Flats, Oahu, Hawaii. This design-bid-build (DBB) project is to dredge and clear two (2) sections of Kahauiki Stream, clean out two (2) existing concrete culverts drainpipes on one section, and an option to replace one of the concrete culverts drainpipes. the major elements of the scope of work include, but are not limited to pre-mobilization activities; compliance with applicable environmental requirements; mobilization which includes preparation of temporary construction staging and dewatering areas; dredging of accumulated sediments; transportation of material according to specified environmental best management practices; testing of dredged material prior to upland disposal; transportation of the dewatered sediments to the pvt landfill as the upland disposal site; and, demobilization which includes the restoration of the temporary construction staging and dewatering areas to their original condition.
From the official notice on SAM.gov.