Federal opportunity · Presolicitation
HI FLAP CR562(1) Kilauea Point
6982AF27B000008 · Transportation, Department of · SAM.gov
- Agency
- Transportation, Department of › Federal Highway Administration › 6982Af Central Federal Lands Divisi
- Responses due
- Not listed
- Posted
- Oct 15, 2026
- NAICS code
- 237310 · Highway, Street, and Bridge Construction
- Set-aside
- None
- Place of performance
- Kilauea, Hi
- Notice type
- Presolicitation
- Solicitation number
- 6982AF27B000008
- Official notice
- View on SAM.gov →
What the agency is buying
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NAME: HI FLAP CR562(1) Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook. The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook.
Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated.
The total project length is approximately 1.70 miles. PRINCIPAL WORK ITEMS: 18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE: Advertise: End of October or Early November 2026 Bid Opening: December 2026 Award: January 2027 Construction: January 2027 –January 2028 ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.
From the official notice on SAM.gov.
See if this one is a Go for your company. Get your score →
Open opportunities in Highway, Street, and Bridge Construction
- Acadia National ParkTransportation, Department of · Due Nov 10, 2026 · 3 days left
- Natchez Trace Parkway Project MS NP NATR 3F26Transportation, Department of · Due Nov 10, 2026 · 3 days left
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadTransportation, Department of · Due Nov 10, 2026 · 4 days left
- OK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsTransportation, Department of · Due Nov 12, 2026 · 6 days left
- ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1Transportation, Department of · Due Nov 13, 2026 · 7 days left
- WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4Transportation, Department of · Due Nov 13, 2026 · 7 days left