Federal opportunity · Award Notice
AwardedFY26 Lake Marion Cameron Reach Water Lines
W912HP26RA003 · Dept of Defense · SAM.gov
Awarded to CHANDLER CONSTRUCTION SERVICES, INC. 1511 NINETY SIX HWY Ninety Six SC 29666 USA · $16,471,000 · Jan 12, 2026
Who won it
- Awardee
- CHANDLER CONSTRUCTION SERVICES, INC. 1511 NINETY SIX HWY Ninety Six SC 29666 USA
- Amount
- $16,471,000
- Award date
- Jan 12, 2026
- Contract number
- W912HP26CA002
- Posted
- Jan 12, 2026
- NAICS code
- 237110 · Water and Sewer Line and Related Structures Construction
- Set-aside
- None
- Place of performance
- Not listed
- Notice type
- Award Notice
- Solicitation number
- W912HP26RA003
- Official notice
- View on SAM.gov →
Similar open opportunities
- PLA RFI for Repair of Waterfront Utility Services Transmitted via a Utilidor Tunnel at NSB Kings Bay, GADept of Defense · Due Nov 9, 2026 · 3 days left
- Fort Mifflin Sewage Lift Station - Certified Bid AbstractDept of Defense · Due Nov 10, 2026 · 4 days left
- Request for Information – Four FY24 Design-Build to Budget Projects; Fort Shafter, HMR, Schofield Barracks and Schofield Barracks East Range.Dept of Defense · Due Nov 10, 2026 · 4 days left
- Atchison Storm Sewer Separation Improvements, Atchison, KansasDept of Defense · Due Nov 13, 2026 · 7 days left
- Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)Dept of Defense · Due Dec 3, 2026 · 26 days left
- USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CADept of Defense · Due Dec 7, 2026 · 30 days left
What the agency bought
THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY.
THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025. This award was made to Chandler Construction in the amount of $16,471,000.00 and is hereby posted on 1.12.2026.
From the official notice on SAM.gov.