AwardedFY 26 Roush Lake Diesel Fill Tube Replacement
W912P626QA030 · Dept of Defense · SAM.gov
Awarded to OTTENWELLER CONTRACTING LLC 1220 EDSALL AVE Fort Wayne IN 46803 USA · $49,920 · Sep 17, 2026
Who won it
- Awardee
- OTTENWELLER CONTRACTING LLC 1220 EDSALL AVE Fort Wayne IN 46803 USA
- Amount
- $49,920
- Award date
- Sep 17, 2026
- Contract number
- W912P626PA025
- Posted
- Oct 1, 2026
- NAICS code
- 237120 · Oil and Gas Pipeline and Related Structures Construction
- Set-aside
- Small Business Set Aside - Total
- Place of performance
- Not listed
- Notice type
- Award Notice
- Solicitation number
- W912P626QA030
- Official notice
- View on SAM.gov →
Similar open opportunities
- Gas Line RepairDept of Defense · Due Nov 17, 2026 · 11 days left
- Mather Fueling System RepairsDept of Defense · Due Nov 20, 2026 · 14 days left
- WH Ford RTC Fueling System RepairsDept of Defense · Due Nov 23, 2026 · 17 days left
- DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, JapanDept of Defense · Due Jan 25, 2027 · 79 days left
- API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, AlaskaDept of Defense · No deadline listed
- Los Alamitos AASF Tank Repair MaintenanceDept of Defense · No deadline listed
What the agency bought
The U.S. Army Corps of Engineers (USACE) - Chicago District is issuing this combined synopsis/solicitation as a Request for Quotation (RFQ) under solicitation number W912P626QA030. This acquisition is being conducted using Simplified Acquisition Procedures in accordance with RFO Part 13.*****This project is a Total Small Business Set-Aside under NAICS code 237120 (Oil and Gas Pipeline and Related Structures Construction), which carries a small business size standard of $45,000,000.00. *****The Contractor shall furnish all labor, materials, supplies, tools, and equipment necessary to complete the construction project located at J. Edward Roush Lake Dam in Huntington, Indiana (Zip Code: 46750). The required work is structured under two primary Firm-Fixed-Price (FFP) Contract Line Items (CLINs): *****CLIN 0001 (Base) - Replace Diesel Tank Fill Tube: Safe removal of the existing ~20-foot-long fuel fill tube located on a sloped embankment. Installation of a new, sealed connection from the interior 2,000-gallon tank to the road deck fill point, terminating in a lockable filler neck and cap assembly. The new fill tube must be constructed of ASTM A106, Grade B, Schedule 40 seamless carbon steel pipe.
Show the full description · 426 more wordsShow less
Surface preparation and application of a vinyl paint system conforming to USACE Formula V-766e in strict accordance with UFGS Section 09 97 02 (Painting: Hydraulic Structures) is required. *****CLIN 0002 (Base) - Install Emergency Vent on Diesel Tank: Correct calculation of the required venting capacity and installation of an appropriately sized, brand-approved emergency pressure relief vent on the existing 2,000-gallon diesel fuel tank located on the 3rd floor of the tower structure, in strict accordance with National Fire Protection Agency (NFPA) 30, Section 22.7. *****Warranty Requirements: In accordance with SOW Section 4.E and RFO 52.246-21 (Warranty of Construction), the Contractor shall provide a standard 1-year warranty on materials and a general 1-year warranty for installation, running from the date of final Government acceptance. *****STATUTORY SMALL BUSINESS DISCLOSURE: DEFINITIZATION OF EQUITABLE ADJUSTMENTS (RFO 36.101-4 and DFARS CD 2026-O0019)As required by 15 U.S.C. 644(w), when the Contracting Officer anticipates the award of a construction contract to a small business concern, the solicitation notice must include information regarding the agency s definitization of equitable adjustments for change orders: *****USACE Policies and Procedures: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to USACE Partnering Details (https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/) then scrolling down on the right-hand side of the page and clicking on View FFP Contract Changes Playbook Here. *****No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. *****SUBMISSION MODULE and PORTAL REGISTRATION (MANDATORY)To submit a quote, your firm must be registered in the System for Award Management at SAM.gov and within the DoD Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at PIEE Portal. *****Submission Method: Quotes must be submitted electronically via the PIEE Solicitation Module. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
Any questions regarding the PIEE portal should be directed to the PIEE Helpdesk at the portal link above. *****Site Visit Coordination: A site visit is highly recommended. To coordinate access to the J. Edward Roush Lake Dam, contact Lake Manager Wesley Millar via email at [email protected] or phone at 260-356-8648. *****Inquiries/Questions Due Date: All technical and administrative questions must be submitted via email to James Parizek at [email protected] no later than September 3, 2026, at 4:00 PM Central Time. Please include the solicitation number in the subject line.*****Responsibility Statement: All responsible sources may submit a quotation which, if received in a timely manner, shall be considered by the agency.
From the official notice on SAM.gov.