Federal opportunity · Presolicitation
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
W9128F27RA056 · Dept of Defense · SAM.gov
! Responses due Nov 20, 2026, 3:00 PM ET · 14 days left
- Responses due
- Nov 20, 2026, 3:00 PM ET
- Posted
- Oct 16, 2026
- NAICS code
- 237990 · Other Heavy and Civil Engineering Construction
- Set-aside
- None
- Place of performance
- Not listed
- Notice type
- Presolicitation
- Solicitation number
- W9128F27RA056
- Official notice
- View on SAM.gov →
What the agency is buying
This is a pre-solicitation notice. This is not a solicitation and any offers received as a result of this pre-solicitation notice will not be accepted or evaluated. USACE Omaha District intends to issue Request for Proposal (RFP) solicitation W9128F27RA056 for the following action in November 2026 with the planned proposal due date in January 2027. ***PLEASE REFERENCE THE SITE VISIT INSTRUCTIONS IN THE ATTACHED DOCUMENT AND RESPOND NO LATER THAN THE DATE SHOWN.
Project Title: Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site Project Location: One mile north of the town of Creede in Mineral County, Colorado NAICS Code: 237990 - Other Heavy and Civil Engineering Construction PSC Code: Y1LC - Construction of Tunnels and Subsurface Structures Set-Asides: This solicitation will be issued unrestricted; both small and large businesses are encouraged to participate. Synopsis of Project: Construction Services for the Nelson Tunnel/Commodore Waste Rock Site (Nelson Tunnel Site or Site), the focus of the interim remedial action (IRA), consists of an abandoned underground hard rock mine and drainage tunnel with several shafts, crosscuts and drafts branching off the main tunnel. The remedial action objective of the RA is to reduce the likelihood of a large, uncontrolled release of mine-impacted water from mine pools impounded within the Nelson Tunnel.
Show the full description · 169 more wordsShow less
The selected alternative for the Nelson Tunnel Interim Record of Decision (IROD) is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead within Nelson Tunnel. The IROD selected remedy is Alternative 4, Drive New Adit to Intersect Nelson Tunnel, Tunnel Rehabilitation, Install Bulkhead in Nelson Tunnel and Flow Control Structure in Commodore 5 level and include the following remedial components. 1. Installation of a new adit south of Nelson Tunnel, to bypass the Nelson Tunnel Portal Pool. 2. Rehabilitation of Nelson Tunnel from the bypass adit connection to the location where bulkhead construction is planned. 3. Installation of a flow control bulkhead in Nelson Tunnel to protect against a sudden uncontrolled release through Nelson Tunnel.4. Installation of an accessible bulkhead flow control structure in the Commodore 5 level to protect against a sudden uncontrolled release through this level. Additional Information can be found at the following EPA website provided in the attachment.
From the official notice on SAM.gov.
See if this one is a Go for your company. Get your score →
Similar open opportunities
- Tybee Island Shoreline Protection ProjectDept of Defense · Due Nov 6, 2026 · Under a day left
- P-1417: Containerized Long Weapons Storage Magazine, Naval Weapons Station Yorktown, Yorktown, Virginia & P-1418: Conventional Prompt Strike (CPS) Weapons Maintenance and Storage Facility, Naval Weapons Station Yorktown, Yorktown, VirginiaDept of Defense · Due Nov 6, 2026 · Under a day left
- Tenkiller Hydropower Excitation System ReplacementDept of Defense · Due Nov 6, 2026 · Under a day left
- FY27 Texas City Ship Channel Main Channel and Turning BasinDept of Defense · Due Nov 7, 2026 · Under a day left
- Kissimmee River Restoration (KRR) Project, S-69 Weir RepairDept of Defense · Due Nov 9, 2026 · 2 days left
- Arcadia Wet Well RehabilitationDept of Defense · Due Nov 9, 2026 · 3 days left