Federal opportunity · Presolicitation
ClosedB2210 Upgrade X-Ray Controller
C27-003 · Dept of Defense · SAM.gov
Closed. Responses were due Nov 5, 2026, 11:00 AM ET.
Find open ones →- Agency
- Dept of Defense › Dept of the Air Force › Fa8125 Afsc Pzima
- Responses due
- Nov 5, 2026, 11:00 AM ET
- Posted
- Oct 29, 2026
- NAICS code
- 334515
- Set-aside
- None
- Place of performance
- Tinker AFB, Ok
- Notice type
- Presolicitation
- Solicitation number
- C27-003
- Official notice
- View on SAM.gov →
Similar open opportunities
- AccelerometerDept of Defense · Due Nov 6, 2026 · Under a day left
- Source Sought for Schneider Electric PowerLogic ION8650 Power and EnergyDept of Defense · Due Nov 9, 2026 · 3 days left
- 66--Transducer,motionalDept of Defense · Due Nov 9, 2026 · 3 days left
- 66--Diagnostic Unit,engineDept of Defense · Due Nov 9, 2026 · 3 days left
- UH-60L/M Operational Test Program SetsDept of Defense · Due Nov 10, 2026 · 4 days left
- VDATS Astronics Repair BPADept of Defense · Due Nov 11, 2026 · 5 days left
What the agency was buying
The 76 CMXG is requesting the utilization of funds for the procurement of Upgrade Xray controller and Automated Equipment. In accordance with AIR FORCE T.O 33B-1-2 (Table 3, Master List of Suppo1t Equipment), the system must be an approved equivalent to the X-Ray Apparatus Set (Master/Procmement NSN: MIL-PRF-32133/6635-01-394-5926). The required system must strictly adhere to the following component specifications: SYSTEM SPECIFICATIONS (Upgrade X-ray booth X-ray controller and automated equipment) • Hardware: Includes new servo motors, drives, operator control user interfaces, and manual controls hardware. • Software: Features programmable motion control software based on Parker Motion Systems libraries. It includes an intuitive interface for custom motion programs, automatic inspection positioning for repeatable programs, and digital image capture/save capabilities. • System Integration: The upgraded motion program will operate on the existing Vecow PC, interfacing directly with cmTent imaging software.
INSTALLATION, TRAINING AND DOCUMENTATION • Installation & Training: Installation and a minimum of 4 homs of Operator and Maintenance Training onsite. (Covers travel, labor, shipping, and necessaiy bracketing hai·dwai·e to mount/remove equipment in the CMXG TSG X-ray System, with up to two (2) days onsite for installation, testing, debugging, and system acceptance). • Removal and Disposal of the existing equipment. • Documentation: Deliver three (3) complete sets of engineering manuals, which include drawings, schematics, and troubleshooting guides.
From the official notice on SAM.gov.