Federal opportunity · Sources Sought
ClosedAllatoona Lake Dam - Eight (8) Sluice Gate
W9127827RA006 · Dept of Defense · SAM.gov
Closed. Responses were due Oct 12, 2026, 2:00 PM ET.
- Responses due
- Oct 12, 2026, 2:00 PM ET
- Posted
- Sep 9, 2026
- NAICS code
- 332312 · Fabricated Structural Metal Manufacturing
- Set-aside
- None
- Place of performance
- Not listed
- Notice type
- Sources Sought
- Solicitation number
- W9127827RA006
- Official notice
- View on SAM.gov →
Similar open opportunities
- 53--Screw,close ToleranDept of Defense · Due Nov 8, 2026 · 2 days left
- 17--HandrailDept of Defense · Due Nov 8, 2026 · 2 days left
- Environmental Control Work Booth/ Sanding Booth.Dept of Defense · Due Nov 10, 2026 · 4 days left
- 17--Roller and HousingDept of Defense · Due Nov 11, 2026 · 5 days left
- Lower Monumental Diffuser GratingDept of Defense · Due Nov 13, 2026 · 7 days left
- 44--Baffle,fluid Cooler,inDept of Defense · Due Nov 15, 2026 · 9 days left
What the agency was buying
This is a Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm-Fixed Price (FFP) Single Award Task Order Contract (SATOC) to fabricate and deliver contract to manufacture eight (8) new replacement cast steel sluice gates for the Allatoona Dam in Cartersville, Georgia. The delivery location is Allatoona Dam, Allatoona Dam Road SE, Cartersville, GA 30121. The anticipated delivery date/timeframe is Summer 2027. The Statement of Work includes the following: The U.S. Army Corps of Engineers (USACE), Mobile District, requires a fabricate and deliver contract to manufacture eight (8) new replacement cast steel sluice gates for the Allatoona Dam in Cartersville, Georgia. The contractor will be responsible for casting, machining, testing, and delivering new gates that match the existing gate dimensions of five-foot and eight-inches wide by ten-foot and zero inches high (as-builts attached for reference only). Due to the intricate structural ribbing and variable cross-sectional thicknesses of the original design, the new gates require highly complex casting to ensure proper form, fit, and function within the dams existing embedded infrastructure.
The contractor will then be required to deliver to the Government after acceptance.
From the official notice on SAM.gov.